The traditional plan configuration of a church nave (blue) surrounded by chapels (yellow) for example in San Lorenzo above has been transformed in this project below into a church nave (blue) surrounded by cinema screens (yellow).
to reduce the severity of the cantilevers some of the footings have been amended.
also to make more rational load paths for some of the spans the internal volumes of the cinemas have been manipulated.
here is the base 3dmodel with these amendments (finally with previous configuration)
sections taken at the moment of the Sunday morning pre-mass screening spectacular.
this is the weekly moment that the screen each for Elijah et al come into their element.
(I just remembered.. there is a simple spot the difference with the sections between these and the other format. not the omission of a plan, addition of the film stills or size of images)
with clearer plan and dimensions
these split lines are going to be integrated with the sections
museum for the three pronged car maker by un studio
by no means final sections
option one generally 8m pours, with exception of the freelevel
concrete surfaces
interior
Sq. m
total interior surface area excluding cinemas
18,750
freelevel floor
10,270
soffits, walls and underside of roof
8,480
cinemas 
17,236
level floor
4,555
risers and level floor (red)
5,174
risers alone
619
ceiling soffit
5,446
vertical walls
6,171
exterior

outer skin
20,937
flat soffit underbelly
1,891

of which this portion is vertical (blue)
1,717
this proportion is horizontal (pink)
1,825
the underbelly of the church
public realm extension
circulation

skin

permanent core/ephemeral periphery

foundations
cranes
expansion/reinforcement