Work in progress positioning of the connections

| | Comments (0)
Very crude and nowhere near what its gonna look like, but I've started to position the connections first to diagonally, reinforce the structural frame, then, started to connect some of these inward to cross brace the structure inwardly. 

The next step is too support, the resulting cantilevels with smaller structural elements
Then Position the Major spaces
Then bring in Light connections from the North. 
Then Puncture Holes In the top to create wind flow through to minimize wind pressure
Then create the interior circulation connections. 
Then hopefully it will look much more intricate.render-test.jpg

Leave a comment

About this Entry

This page contains a single entry by Mickey Kloihofer published on February 8, 2010 10:23 PM.

the thesis is growing (slowly) was the previous entry in this blog.

1 bay of building showing structure and circulation valves is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.32-en