3D Modelling ongoing

| | Comments (1)
modellingblog.jpg

According to Plan 01, interweaving paths is quite mess, need to configure a bit more.

But position of cells still the same.

 

going to

1. configure all the path leading to main space.

2. prototype100, 10 add

3. landscape design in between the path.

4. thickness    

1 Comments

Natasha Sandmeier said:

it looks as though you are trying to avoid actually developing and designing your project again.

your model of the blue interwoven space that we saw on tuesday was actually quite interesting - I don't think you need to now spend any time modelling some of the existing background (gray) buildings or spend too much time weaving your paths through the site independently of your spaces. Instead, start from your main space, weave your spaces in and through the objects to generate your balconies and relations to the neighboring spaces. go forward - don't avoid the project.

Leave a comment

About this Entry

This page contains a single entry by Jake Choi published on November 28, 2007 8:05 PM.

Plan Ver.01 / intersection with cell was the previous entry in this blog.

modified modelling 02 is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.01