Archives
- 2009.06.01: overall scheme
- 2009.05.24: underneath the music hall fragment
- 2009.05.24: at new ground level
- 2009.05.24: at new ground level
- 2009.05.18:
- 2009.05.18:
- 2009.05.18:
- 2009.05.18: snapshots of 1.250 site model so far
- 2009.05.17: next steps..
- 2009.05.17: a selection of views created by intervention
- 2009.05.17: programme
- 2009.05.17: Drawings that Im now working from
- 2009.04.30: i more thing
- 2009.04.30: more
- 2009.04.30: an instance - a side street
- 2009.04.30: overall scheme
- 2009.04.22: Set up: starting image and modifcations
- 2009.04.22: setting up spaces
- 2009.03.22: two types of fragments
- 2009.03.22: 1 fragment
- 2009.03.18: articulation of surface
- 2009.03.18: Making the fragment self supporting by moving control points, tying back to vertical walls or propping weak planes with additional planes (folding)
- 2009.03.16: Work in progress
- 2009.03.16: section diagrams
- 2009.03.16: clarifying
- 2009.03.12: Comparison of In situ Concrete constructions
- 2009.03.09: type B - planes form volumes
- 2009.03.05: a detail
- 2009.03.02: a chart of types of fragments
- 2009.02.26: TS Outline page Revised - Inhabitable cantilevering planes
- 2009.02.26:
- 2009.02.26: Fender of landscape of fragments
- 2009.02.19: screen grab image
- 2009.02.19: screen grab of surface
- 2009.02.19: Elevation for image 1
- 2009.02.15:
- 2009.02.15:
- 2009.02.15: Sketch model
- 2009.02.14: its coming..
- 2009.02.12:
- 2009.02.09:
- 2009.02.09:
- 2009.02.04:
- 2009.02.04: composing part2
- 2009.02.04: composing!
- 2009.01.26: is this working?
- 2009.01.26:
- 2009.01.26:
- 2009.01.26:
- 2008.12.01:
- 2008.12.01:
- 2008.12.01:
- 2008.12.01:
- 2008.12.01:
- 2008.11.23:
- 2008.11.23:
- 2008.11.20:
- 2008.11.20:
- 2008.11.16:
- 2008.11.16:
- 2008.11.16:
- 2008.11.16:
- 2008.11.10:
- 2008.11.03:
- 2008.10.30:
- 2008.10.23:
- 2008.10.21:
- 2008.10.19:
- 2008.10.14:
