Archives
- 2009.06.14: Monuments on top
- 2009.06.14: Roof Garden on the site
- 2009.06.13: pool side 45 x 90
- 2009.06.12: Monuments as 2 plates
- 2009.06.12: Silo in coridor revised
- 2009.06.12: Monuments revised
- 2009.06.11: silo in coridor rerendered
- 2009.06.08: icons on slab
- 2009.06.08: Slab on site test - ????
- 2009.06.08: roof view 90 x 45 plate
- 2009.06.08: Silo in coridor
- 2009.06.06: Silo in coridor plate wip
- 2009.06.06: 2x Roof double plates wip
- 2009.06.04: Render wip preview
- 2009.06.04: ROOF SLAB - GARDEN AND PROGRAM -wip
- 2009.06.01: The Silo
- 2009.06.01: LW model
- 2009.06.01: Model - Wip
- 2009.05.24: Images through the Silo
- 2009.05.23: More Graphic - Test ??
- 2009.05.23: Perspective section Render - Not working!!
- 2009.05.23: Silo with Slab
- 2009.05.23: Silo Revision
- 2009.05.21: Silo Light - TEST
- 2009.05.21: Silo beam detail wip
- 2009.05.18: LW's more 3D - Wip
- 2009.05.18: LW's more 3D - Wip
- 2009.05.14: Model WIP
- 2009.05.13: With a little light
- 2009.05.13: Version 1 Light Well Model Pieces
- 2009.05.12: Light Well - Unfolded for Laser cutting
- 2009.05.12: Light Well WIP
- 2009.05.07: LW's WIP WIP WIP
- 2009.05.06: Precedents for Light Well openings
- 2009.05.06: Precedents Gardens
- 2009.05.04: LIGHT WELLS axo WIP
- 2009.04.30: Light Well distribution
- 2009.04.30: Plans
- 2009.04.30: South Elevation_Site Visit
- 2009.04.30: Site Visit - North Elevation
- 2009.04.27: Time line revised
- 2009.03.26: WIP
- 2009.03.23: Reference Image
- 2009.03.23: Asending Circulation around the Pool
- 2009.03.23: e.g. WIP triage
- 2009.03.23: Model Wip
- 2009.03.19: 03 level_ Pool Base Intersection - WIP
- 2009.03.19: 02 level_Acute Intake & Service Core
- 2009.03.19: O1 Level_ Triage
- 2009.03.19: 00 level_Public & Parking
- 2009.03.17: Plan o1 wip update
- 2009.03.16: Plan 01 - wip\- quick screen shots
- 2009.03.12: Tests
- 2009.03.12: park wip
- 2009.03.11: wip - primary routes..still boring more coming later
- 2009.03.11: Circulation - Main arteries wip
- 2009.03.09: Garden Slabs
- 2009.03.08: close up - insertion of program wip
- 2009.03.08: Circualtion WIP
- 2009.03.05: ???
- 2009.03.05: carving out program
- 2009.03.02: Putting together the puzzle
- 2009.03.01: Program Distribution
- 2009.03.01: White Book Stuff
- 2009.02.26: Section - Scentic Slab Wip
- 2009.02.26: Ward Organization
- 2009.02.23: ???
- 2009.02.23: 05_Programmatic Slab intersecting Structural 'container slab'
- 2009.02.23: 04_ Slab Structure and Transition
- 2009.02.23: 03_ Programatic Slab
- 2009.02.23: 02_ Technical Slabs
- 2009.02.23: 01_Prgramatic Slab moving between unviolated slabs
- 2009.02.23: LC's Podium_ Ville Radieuse
- 2009.02.23: Poduim_Slabs by Oscar Niemeyer
- 2009.02.19: New graphics? Slabs ..large and small WIP
- 2009.02.18: Stuff...from the little prince
- 2009.02.18: Stuff...from Paul Virilio
- 2009.02.18: Strange Section options- WIP
- 2009.02.16: Sketch_interior to cantilever support to grid_wip
- 2009.02.16: 02_ Developed into two Balcony options???? WIP
- 2009.02.16: 05_ Concrete Beam Options
- 2009.02.16: 04_ Concrete Beam Options
- 2009.02.16: 03_ Concrete Beam Options
- 2009.02.16: 02_ Aternating Beam Thicknesses
- 2009.02.16: 01_ Basic I Beam
- 2009.02.16: Generic Spann - Slab/Beam Options
- 2009.02.12: Slab Sketches - Prior to previous entry
- 2009.02.12: Section Through Three Floors - WIP
- 2009.02.09: Working Model Wip
- 2009.02.09: Plan on Site
- 2009.02.09: Slab Hieghts relative to Surrounding Buildings
- 2009.02.09: Height Restrictions Around Moskova Bank
- 2009.02.03: Plan - WIP
- 2009.01.29: Slab Behavior
- 2009.01.29: Plan WIP
- 2009.01.26: Section Studies WIP
- 2009.01.22: Hospital Studies - Scale Diagrams WIP
- 2009.01.22: Hospital Studies - Venice Hospital
- 2009.01.22: Hospital Studies - UCLH
- 2008.12.08: SECTION
- 2008.12.07: Plan Level 27 - WIP
- 2008.12.07: Close up
- 2008.12.07: PLAN - LEVEL 13- CHURCH OF 1000 TEMPLES
- 2008.12.04: WIP
- 2008.12.02: New Plan WIP - Church of a Thousand Temples?
- 2008.12.01: Moscow Moments
- 2008.12.01: The Rise of the Patriarch
- 2008.11.27: Plan II -
- 2008.11.25: Impression & Intersection Model
- 2008.11.25: Plan of the Foundation Slab I
- 2008.11.24: Hmm... and one more image.
- 2008.11.24: Church and State
- 2008.11.24: Small precedent booklet to be inset into the White Book
- 2008.11.20: Not there yet
- 2008.11.20: Impression & Intersection
- 2008.11.19: Formal Manifesto I
- 2008.11.19: Manifesto IV
- 2008.11.18: Impression
- 2008.11.17: Containment Model - to print
- 2008.11.14:
- 2008.11.13: Preperation of First Preservation/Destruction Model
- 2008.11.13: First attempt at defining the lanscape
- 2008.11.10: Manifesto III
- 2008.11.06: Yes, it is gold...
- 2008.11.02: Manifesto_Revision 1
- 2008.10.30: The fist manefestation of my manefesto
- 2008.10.28: A steamier and more sultry Palace of the Patriot
- 2008.10.28: Development of the Palace of the Patriots - Folded Plate 45x180
- 2008.10.27: Monuments - plate two
- 2008.10.25: Timeline - second edition
- 2008.10.24: Palace of the Patriots: Sections for the 1954 Competition
- 2008.10.23: Timeline - first edition
- 2008.10.21: Palace of the Patriots
- 2008.10.20:
- 2008.10.17:
- 2008.10.16: Re-Engineered Breif: The Palace of The Soviets
- 2008.10.13: Lost Monuments
