Model Wip

| | Comments (0)
c1.jpgcc2.jpgcc3.jpg


I have more or less worked out all the transitions from Public 1-2 to Private 1 and from Public 3-4 to private 2. Si now I know the main slab height transitions onto which I can project the plans. I modeled a tiny area of teh plan to bet feed back. I am not sure if it is best to model the slabs as thin slab and add or to model everything solid and boolean out. I think with the boolean it will be hard to understand hod the building is working.
Anyway, I have modelled up to the the level of each respective floor from the central distribution area. Now it is the question of if I project the plans onto the floor levels and extrude the circulation - connecting it the cores or if I work on refining a slab mass model?? I have to do both eventually.

Leave a comment

About this Entry

This page contains a single entry by Amandine Kastler published on March 23, 2009 12:10 PM.

03 level_ Pool Base Intersection - WIP was the previous entry in this blog.

e.g. WIP triage is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.01